With the gas proof membrane down the insulation was cut to size and laid at the start of the week and then the floor was poured. The base of the road inside site was also laid giving a clean and safe access up to the building ready for all trades working on the external envelope and internals. The scaffolders also made a start towards the end of the weeks in preparation for the Timber frame next week.